What this work involves
Coordinate ground investigation with foundation design, equipment access and potential effects on neighbouring structures.
- Ground investigation and pile layout
- Equipment and working space
- Neighbouring-condition records and monitoring
Use the following design considerations when coordinating this service with a wider project. Agree which parts apply to your request.
Coordinate foundations and floor build-up with agreed finished levels.
What the drawing needs to explain
Draw a section with internal floor, threshold, outside level and drainage. Add a plan showing door movement, shoe storage and everyday access.
Decide this before construction
Fix levels and drainage before ordering flooring and the door. Plan a temporary rear exit if the existing kitchen remains in use.
Cost factors for this service
Costs depend on pile system, quantity, depth and mobilisation. Ask for the scope and selected specification to be described separately.
Bring this to the discussion
Photographs of the existing situation, available drawings and your requirements for piling & piled foundations. Identify the elements that should remain.
Questions about the work
What should I discuss before arranging piling & piled foundations?
The choice follows ground data and structural calculations. A method used next door is not automatically suitable for your project.
The design situations here illustrate choices; they are not completed projects or a diagnosis of your property.

